[1]
Astuti, S. et al. 2020. PERHITUNGAN WAKTU STANDART UNTUK MENENTUKAN JUMLAH TENAGA KERJA DAN KEBUTUHAN MESIN/ALAT PADA PROSES PRODUKSI REAGEN ALAT/ASAT (GPT) FS (IFCC mod) DI PT. PDL. Jurnal KaLIBRASI - Karya Lintas Ilmu Bidang Rekayasa Arsitektur, Sipil, Industri. 3, 2 (Nov. 2020), 1–19. DOI:https://doi.org/10.37721/kalibrasi.v3i2.738.