Rifardi, A., Fipiana, W. I., & Agustin, M. (2021). PERENCANAAN WAKTU PENYELESAIAN PROYEK DENGAN MENGGUNAKAN CRITICAL PATH METHOD STUDI KASUS PROYEK PEMBANGUNAN BOOSTER DEG SHELTER FOUNDATION TBBM PT. PERTAMINA – KUTOWINANGUN – CILACAP. Jurnal KaLIBRASI - Karya Lintas Ilmu Bidang Rekayasa Arsitektur, Sipil, Industri, 4(2), 1–26. https://doi.org/10.37721/kalibrasi.v4i2.886