RIFARDI, Allan; FIPIANA, Wahyu Inggar; AGUSTIN, Meilan. PERENCANAAN WAKTU PENYELESAIAN PROYEK DENGAN MENGGUNAKAN CRITICAL PATH METHOD STUDI KASUS PROYEK PEMBANGUNAN BOOSTER DEG SHELTER FOUNDATION TBBM PT. PERTAMINA – KUTOWINANGUN – CILACAP. Jurnal KaLIBRASI - Karya Lintas Ilmu Bidang Rekayasa Arsitektur, Sipil, Industri, [S. l.], v. 4, n. 2, p. 1–26, 2021. DOI: 10.37721/kalibrasi.v4i2.886. Disponível em: https://ejournal.borobudur.ac.id/index.php/teknik/article/view/886. Acesso em: 26 apr. 2024.